TURBINE IN WATER TREATMENT PLANT (GRANVILLE-FRANCE)

TURBINA A LA ENTRADA DE PLANTA POTABILIZADORA (ETAP) EN GRANVILLE (FRANCIA)

The water treatment plant in Granville (France) receives raw water pumped from a river. The water is stored in an elevated reservoir before being treated at the plant. This means that the pipe that carries the water to the plant reaches a pressure of 1.2 bar. Later, the water is stored in a pre-treatment tank. …

Read more

¡Call now!